11 : Residential Scale Projects : CLR
______________________________________________________________________________________________________________________________________________

In December 2007 11.1 was asked to remodel an existing residence of 2,000SF in Beverly Hills and add an extra story to the structure. 11.1 proposes to alter the spatial dynamics of the entire structure to gain a more spacious and cohesive interior and exterior. The design parameters are derived from the existing site dynamics and references to contemporary aircraft and vehicular design, purposefully shifting the attention of the proposal from a traditional building to a designed object, furniture, and mechanism.

The structure is comprised of two stories featuring a terrace and the master bedroom in the upper level and all the main functions of the building in the lower area. Construction is scheduled for fall 2008.
______________________________________________________________________________________________________________________________________________

Construction scheduled for Fall 2008.
Design Principal: Axel Schmitzberger, Arshia Mahmoodi
Team: Brittany DePaul, Miguel Gonzalez, Max Orzi
Structural: A & G Structural Inc.
______________________________________________________________________________________________________________________________________________